Processus de fabrication et de production des carreaux peel and stick
Quick answer
WOTILE peel and stick tiles are made through printing, embossing, adhesive coating and die-cutting on our own production lines in Shenzhen. Standard lead time is 7–15 business days after specs are confirmed, with QC at every stage. Products ship FOB Shenzhen, CE/SGS certified, worldwide.
WOTILE peel and stick tiles are made through printing, embossing, adhesive coating and die-cutting on our own production lines in Shenzhen. Standard lead time is 7–15 business days after specs are confirmed, with QC at every stage. Products ship FOB Shenzhen, CE/SGS certified, worldwide.
Processus de fabrication et de production des carreaux peel and stick
WOTILE s’approvisionne en carreaux peel and stick auprès d’un réseau vérifié d’usines certifiées. Voici comment une commande type passe de la matière première à votre entrepôt.
Flux de production
- Préparation du matériau — couche de base PVC / résine / gel + papier antiadhésif
- Impression et gaufrage — motif et relief 3D
- Enduction adhésive + film protecteur silicone
- Découpe au format carreau / plaque
- Contrôle qualité [Détails à confirmer : surface de l’usine / nombre de lignes / capacité mensuelle]
- Emballage et impression des cartons (prêt pour marque propre)
- Export consolidé et documentation
Normes de qualité
[Détails à confirmer : certifications réelles CE / SGS / ISO9001 / REACH / BSCI avec numéros et dates de validité]
