Processo de fabrico e produção de azulejos peel and stick
Quick answer
WOTILE peel and stick tiles are made through printing, embossing, adhesive coating and die-cutting on our own production lines in Shenzhen. Standard lead time is 7–15 business days after specs are confirmed, with QC at every stage. Products ship FOB Shenzhen, CE/SGS certified, worldwide.
WOTILE peel and stick tiles are made through printing, embossing, adhesive coating and die-cutting on our own production lines in Shenzhen. Standard lead time is 7–15 business days after specs are confirmed, with QC at every stage. Products ship FOB Shenzhen, CE/SGS certified, worldwide.
Processo de fabrico e produção de azulejos peel and stick
A WOTILE adquire azulejos peel and stick numa rede verificada de fábricas certificadas. Eis como uma encomenda típica passa da matéria-prima ao seu armazém.
Fluxo de produção
- Preparação do material — camada base PVC / resina / gel + papel antiaderente
- Impressão e relevo — padrão e textura 3D
- Revestimento adesivo + película protetora de silicone
- Corte a formato de azulejo / placa
- Inspeção de qualidade [Detalhes a confirmar: área da fábrica / nº de linhas / capacidade mensal]
- Embalagem e impressão de caixas (pronto para marca própria)
- Exportação consolidada e documentação
Normas de qualidade
[Detalhes a confirmar: certificações reais CE / SGS / ISO9001 / REACH / BSCI com números e datas de validade]
